Constructum Projects
Ten real projects in the constructum sector, from a won bid to a finished site. Involvement in a project means participating in the project and sharing in its actual net revenue — the Participant Pool is 10% of each project’s net revenue, distributed monthly among qualifying participants. It is not a yield on CST and no return is promised.
Each project has a participation gate: hold CST worth 1% of the project’s value (in CAD). The gate is a balance check only — nothing is spent, transferred, or locked, ever. Holds stack: your balance must cover the sum of the gates of every project you join. Involvement stays active only while your wallet is connected and the hold is met; if the balance drops or the wallet disconnects, involvement suspends and resumes automatically when the hold is restored.
Need CST? Buy CST on XMarkets · Mine CST on Omnichain
Renovation & Repair Crew T1 Bootstrap
Every neighbourhood has the same backlog: bathrooms past their life, decks rotting, basements half-finished by a contractor who vanished.
| Project value | $37,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Crew equipped, first 10 jobs signed off |
| Participation gate | Hold ≈ — CST ($370 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-job renovation contracts at quoted prices, plus a standing repair program for landlords and property managers (per-call rates under an annual agreement). The job record — quote, photos, change orders, sign-off — is the crew's advertising.
What involvement gets you: the pool share; jobs and revenue reporting; a priority booking each year for a holder's own renovation work at quoted crew rates.
Milestones: Crew equipped, first 10 jobs signed off · landlord repair program under agreement · second crew for the summer season · kitchen/bath specialisation crew formed on demand
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Concrete Forming & Flatwork Crew T1 Bootstrap
Foundations, driveways, sidewalks, and slabs — the concrete work every build starts with and half the small builders in a region are waiting on.
| Project value | $48,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Forms and equipment complete, first season booked |
| Participation gate | Hold ≈ — CST ($480 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-job concrete contracts priced by the cubic metre and the square foot, plus winter interior slab work. Pour scheduling against weather is the craft; the ERP calendar is how the crew sells certainty.
What involvement gets you: the pool share; pours and season reporting; priority pour dates for a holder's own project at crew rates.
Milestones: Forms and equipment complete, first season booked · 100 pours completed and recorded · second forming crew for peak season · decorative/stamped flatwork line added
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Residential Framing Contractor T2 Startup
Home builders live and die by their framing crews — a slow crew idles every trade behind it.
| Project value | $155,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Two crews working under builder agreements |
| Participation gate | Hold ≈ — CST ($1,550 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-house and per-project framing contracts with builders, priced by the square foot under standing rate agreements. Repeat builders are the business; the schedule record is why they stay.
What involvement gets you: the pool share; houses framed and schedule-performance reporting; framing capacity priority for a holder's own building project.
Milestones: Two crews working under builder agreements · 50 houses framed · multi-family crew (4–6 storey wood frame) certified and working · third crew and a dedicated deficiency/closeout team
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Contractor Equipment Rental Yard T2 Startup
Small contractors lose bids because they don't own the excavator, the lift, or the compaction kit the job needs for nine days.
| Project value | $240,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Yard opened with the core fleet |
| Participation gate | Hold ≈ — CST ($2,400 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: daily/weekly/monthly rental rates plus delivery and pickup fees. Utilization per machine, reported from ERP records, decides what the yard buys next — not hunches.
What involvement gets you: the pool share; fleet utilization and revenue reporting; founding rental rates for a holder's own contracting work.
Milestones: Yard opened with the core fleet · fleet utilization above 65% in season · second delivery truck and weekend service · satellite yard in the next market scoped on the utilization record
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Design-Build Home Construction Company T3 Growth
Custom-home clients fear two things: the budget that doubles and the builder who disappears into other jobs.
| Project value | $680,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First 3 homes under contract with open files live |
| Participation gate | Hold ≈ — CST ($6,800 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: design-build home contracts priced per project with staged draws against verified progress. The open file is the sales tool: clients who can watch their build don't need to be sold trust.
What involvement gets you: the pool share; homes under construction and completion reporting; a design consultation and priority build slot for a holder's own home at company rates.
Milestones: First 3 homes under contract with open files live · first completions on budget and schedule, published · 8 homes/year run rate · laneway/garden-suite product line launched on the same open-file model
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Commercial Fit-Out & Tenant Improvement Contractor T3 Growth
Every leased retail, office, and restaurant space needs a fit-out on a landlord's deadline and a tenant's budget — work that rewards speed, cleanliness, and honest deficiency lists.
| Project value | $975,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First 5 fit-outs closed with zero-deficiency handovers |
| Participation gate | Hold ≈ — CST ($9,750 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-project fit-out contracts, plus standing improvement agreements with property managers for turnover work between tenants. Repeat landlords are the backbone of the order book: they call because the last job closed clean.
What involvement gets you: the pool share; projects and closeout reporting; priority fit-out scheduling for a holder's own commercial space.
Milestones: First 5 fit-outs closed with zero-deficiency handovers · property-manager standing agreements in place · restaurant/retail specialisation crew · night/weekend program for occupied-space work at full rate
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Multi-Family Wood-Frame Construction Program T4 Established
The missing-middle housing every city says it wants — four to six storeys of wood-frame apartments and townhomes — is a repeatable building type that most regions build as if it were invented each time.
| Project value | $4,600,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First building under contract, standard details documented |
| Participation gate | Hold ≈ — CST ($46,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-building construction contracts with developers and housing providers, priced from the program's own recorded costs. The record is the competitive edge: a bid backed by five buildings of actuals beats a bid backed by hope.
What involvement gets you: the pool share; per-building cost/schedule reporting against the program standard; a construction assessment for a holder's own multi-family project at program rates.
Milestones: First building under contract, standard details documented · first completion at or under the program cost standard · three buildings in concurrent construction · program licensed to a second region's builder group
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Civil Infrastructure Contractor T5 Large
Roads, water and sewer mains, storm systems, and subdivision servicing — the civil work every community depends on and few contractors can bond for.
| Project value | $21,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | Bonding line established, first municipal contracts won |
| Participation gate | Hold ≈ — CST ($210,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-contract civil construction (unit-price and lump-sum) for municipalities, utilities, and land developers. Bonding capacity and a clean claims record are the licences to grow; both are built project by project and reported openly.
What involvement gets you: the pool share; contract backlog and project reporting; an infrastructure assessment for a community or development a holder is involved in, at company rates.
Milestones: Bonding line established, first municipal contracts won · underground division at full crew strength · first $5M+ single contract completed and closed clean · paving division added or partnered on backlog
Status: Slate — awaiting owner launch approval. Joining opens at launch.
Industrial Construction & Maintenance Group T6 Mega
Plants, terminals, and industrial facilities are built and maintained by a small club of contractors trusted with shutdown windows measured in hours and safety records measured in absolutes.
| Project value | $170,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First multi-year maintenance contracts operating |
| Participation gate | Hold ≈ — CST ($1,700,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: industrial maintenance and turnaround contracts (multi-year, per-site) plus capital project construction. Phases are committed on operating records: maintenance performance first, construction scope second, larger scope third.
What involvement gets you: the pool share; phase-gate operational reporting (contracts, safety record, backlog); briefings before each phase commitment with the running phases' records in hand.
Milestones: First multi-year maintenance contracts operating · turnaround season delivered inside client windows · first capital construction project on a maintained site · second industrial region opened on the record
Status: Slate — awaiting owner launch approval. Joining opens at launch.
National Housing Construction Program T7 Giga
Canada's housing shortfall is a construction-capacity problem wearing a policy costume: the homes get built when crews, systems, and serviced land exist in the same place at the same time.
| Project value | $750,000,000 CAD |
|---|---|
| Participant Pool | 10% of net revenue, monthly |
| Next milestone | First region operating, standard types costed from live builds |
| Participation gate | Hold ≈ — CST ($7,500,000 CAD) — 1% of project value |
| Your state | Wallet not connected |
What it does & revenue model: per-stage construction contracts as regions come online (homes, multi-family, and supporting civil works), each region financed and reported inside the one program record. No stage proceeds on the promise of a later one; a region opens on the previous region's delivered homes and actual costs.
What involvement gets you: the pool share across program stages; stage-gate reporting in full operational detail; a permanent place in the program's participant registry as regions complete over the build-out.
Milestones: First region operating, standard types costed from live builds · 500th home completed in region one · second region opened on region one's record · multi-region run rate of 1,000+ homes/year verified from completion records
Status: Slate — awaiting owner launch approval. Joining opens at launch.