Submittals Guide

Submittals — approval before fabrication

Shop drawings, product data and certificates exist to catch the wrong material before it is fabricated, shipped or embedded — after which the same discovery costs ten times more. The Submittals module runs that review on the job record: what was submitted, against which spec section, who submitted it, who reviewed it, the review outcome and note, and when the review falls due. Review due dates surface in your work panel while the submittal waits, because a submittal sitting unreviewed is the schedule’s problem wearing a paperwork disguise.

How a submittal moves

Submitted → Under review → Approved, with the two outcomes that make the register honest: Approved as noted (proceed, with the reviewer’s notes forming part of the record) and Revise and resubmit (the submittal goes back, is corrected, and re-enters as Resubmitted → Under review until it approves). A submittal that cannot be accepted is Rejected, with the reason in the review note. The standing rule the register enforces by visibility: nothing is fabricated or ordered off an unapproved submittal, and everyone on the job can see which submittals are still waiting.

Certificates are submittals too

Mill certificates, test reports and compliance documents run through the same register as shop drawings — tied to the material record they certify, so the chain from purchase order to delivery to certificate is one lookup. When an inspector, an owner’s representative or a court asks what the steel in the structure was certified as, the answer is on the job file, not in a filing cabinet at a supplier’s office.

What good looks like

Every spec section that calls for a submittal has one, logged when the work is planned — not when fabrication is already late. Reviews turned around inside their due dates. Resubmittals that reference the review note they answer. And no material on site whose paperwork is still “somewhere in email.”

In the worked example on this site, SUB-001 (record #81) carried the mill certificates for the 40 t of 15M rebar ordered on Job #42 (Materials record #47): submitted by the supplier, taken under review by the design lead, and approved with the heat numbers recorded against the purchase order — before the steel was worked.