Inspections — the sign-off the whole job waits on

An inspection record names its job and site, the inspector, the inspection date, the result, and its state: Scheduled → Booked → Inspected → Passed → Rectified → Closed. The exception states are Failed and Access denied — both recoverable, neither ignorable.

Inspections are gates, not ceremonies

In Alberta, safety codes inspections — building, electrical, plumbing, gas and the other disciplines administered under the Safety Codes Act through municipalities and accredited agencies — are hold points in the work: foundations before backfill, framing before cover, services before concealment. Booking the inspection is therefore a schedule act, not an administrative one: the inspection date sits on the record beside the tasks it gates, and a missed booking with a crew standing by is a coordination failure the schedule will show. Access denied — the inspector attended and could not inspect — is recorded as its own state because it costs the same day as a failure and is fixed differently: access, not workmanship.

Deficiencies: the professional loop

A deficiency is not a disgrace; an untracked deficiency is. The sequence that matters is Passed-with-deficiencies → Rectified → Closed: the finding is written on the record, the rectification is done, and the record closes only when the item is actually made good. That loop is the closeout gate for the whole job — practical completion should not be declared over open inspection items, and the job’s Closed state in the Jobs module is an approval state precisely so someone accountable confirms the inspection file is complete first.

The file at handover

At closeout, the inspection records are the owner’s assurance file: what was inspected, by whom, with what result, and what was rectified. Filed in the vault with the rest of the job file, they answer the questions that arrive years later — at resale, at warranty claims, after an incident — with documents instead of recollections.

Worked example: the foundation inspection on the CHAIN Northgate Yard Expansion passed with one deficiency — hoarding signage at the north gate — which was rectified and the record closed, forming the sign-off leg of that job’s closeout.